Here's the back interior wall going on:
Here's the passenger side wall going on..........
And then the driver's side:
During the day, Patsy enjoyed watching all the progress as the next two pictures show: 

Soon the ceiling was dropped into place, and then the fiberglas roof on top of that:

We went looking for the slides, and found them. Here's the two bedroom slides and the main kitchen slide waiting in the fab areas:

Here's a couple of slide installation shots.............. one in the kitchen, and one in the bedroom:
Shortly before lunch, I complained to one of the floor supervisors about an employee who installed the housing around my driver's side front wheel. When it did not go on easily, he kicked it with his foot and hit it with a ballpeen hammer. He broke a small piece of the fiberglas as shown in the following picture. After we got back from lunch, a guy approached me and asked if I saw someone break a piece of fiberglas on my motorhome by kicking it. The guy turned out to be one of Bob Tiffin's sons, Lex, and he had the guy replace it!! He is in the second picture:

At the end of the day, here what it was looking like (inside and out):

The next picture shows the rear end cap in place:
As we were leaving, they were finishing up the front end cap. Tomorrow, most of the work will be detail items inside, like cabinet doors, light fixtures , etc. We are scheduled to be completely built by noon on Friday.
Here's what the frame looked like before and after station 1. They added flooring for the storage area, the water tanks and the dump station assembly (Plus some smaller items). The center picture shows the guy putting the carpet in the storage area and showing that there is plenty of room for our daughter-in-law to ride here!!:

The next two photos show the setting of the sub floor, and the poor old engine getting more and more covered up:
I think Patsy enjoyed the day, although it was long. I went all day on Friday and Monday, but she wasn't interested in the welding and wiring shop. Today, with the floor and 'furniture' being put in, she really got with it. Here she is supervising:
The following photos show the setting of the tiled floor in the front two thirds of the motorhome, and the carpet in the bedroom:
The last two photos show the washer/dryer in place, and the shower being installed in the bathroom:

Here's our entry with fresh paint. It will be interesting to see how this changes over time. Note the nice hub caps!!:
Here's a couple of shots in the wire shop:
Here's the rig, all wired and painted and waiting for tomorrow when they start building the 'home box':



As we were driving back to Red Bay on the back roads, we got sorta lost! The highway signs in Alabama are different and a little iffy. We eventuallly figured out that they often use 'street' type signs on smaller highways. As we were driving, we noticed a road sign that said "Coon Dog Cemetary Road", and we had heard at the campground the the infamous Coon Dog Cemetary was one of the tourist highlights around Red Bay. We felt that we could not pass up this opportunity, so we turned on the road, and, after passing double-wides, single-wides, outhouses, and various rusting vehicles in the fields, we found the cemetary. I think I also heard 'banjo' music along most of the way. Here is an assortment of pictures:











Here's one of the leveling jacks that was attached to the frame:
Here, they are laying out and welding the frame for the floor of the coach. In the next two pictures, they are setting in on the chassis and then welding it out:

Patsy and I went to get some lunch, and when I got back, they had already added the 'firewall' and framing around the back of the engine. Here's a picture of the generator platform (in the front of the motorhome), and as soon as I took it, the generator was behind me ready to go in!!




We also just got notified that we will get into a site later today. It only has water and electric, but I don't mind dumping every three or four day.