Well, on Monday afternoon, we got our call that a full hookup site was available for us. We moved to site #1, which for those familiar with Red Bay, is right at the front. Here is a picture:
Also, since we have been here, I have made another modification to the Bus. On our last visit to Red Bay, about 8 months ago, I purchased a map light at the campground store, but never got around to installing it. With time on my hands, I finally got around to finding a source of 12v power and got it put up. This will let Patsy look at a map, the Next Exit book, or read while we are driving without lighting up the whole front of the cab, and turning the big windshield into a very large mirror!!
Here are some pictures:
Picture with flash on camera……. Picture with no flash….. mimics real life driving down the road…….
For those that want to know, the source of 12v power was from the awning wind controller panel in the cabinet above the door.
I have used the last couple of days to watch the repair that will be done to the Bus tank bay floor being completed on other motorhomes. We also toured the factory and saw the modifications to this installation on the new units. I posted pictures and opinions on the Tiffin RV Network (TRVN). It can be found by clicking on the red lettering.
Our appointment is for November 1, and we expect to leave here two days after that,,,,,,,,,, at least, that is the plan. Until then, we are having a good time here.
1 comment:
We got our new roof on and are back in site 88. Need to do the bubble test on Monday, painting, diamond shield and few other little things. Hoping to be out of here by next weekend so we can start heading west.
Post a Comment